Mountaire Farms - Hatchery Wastewater System Upgrade
Project involved the design and permitting of a subsurface wastewater disposal system for the chicken hatchery building. The existing system was failing and had to be abandoned. The new system consisted of a septic tank, pump tank, and a pressure manifold disposal system. Using flow equalization the new system will dispose of 12,000 gallons per day of wastewater.

