Replaced existing wastewater system to service the Camp’s dining hall expansion. New system consists of a septic tank, pump tank, and pressure manifold disposal with conventional subsurface trenches. The wastewater is pumped approximately one mile to the disposal fields. The new system will dispose of 7,500 gallons per day of wastewater, which allows the camp to feed 500 campers per day.





